Nanjing Chemical Construction Co., Ltd. was established since April 1956, and was the former Shaft Engineering Company directly under the Construction Bureau of Ministry of Heavy Industry, the No.5 Engineering Company under Chemical Ministry, the No.8 Chemical Construction Company under Chemical Min
NCC has been rewarded for straight 20 years as Contract Honoring and Creditable Enterprise with AAA Credibility and A Tax-paying Credibility by the government department of Industry and Commerce. NCC head office has 11 functional departments and has 31 regional sub-company, project management team,
Chinese Construction Luban Prize (National Excellent Project) 300kt/a Ethylene Plant of YPC is a national key construction project. The cracking furnace, quenching unit, compression area, cold area, hot area, cracking gasoline hydrogenation area, finished product tank farm, cooling tower, wastewater
Over the past 50 years, NCC has undertaken over 600 large and medium size projects at home and overseas with our footprints left all over 29 Provinces, Municipalities or Autonomous Regions at home and more than ten countries across the Asian, African and European Continents. NCC is a National Excell
To report company news at first time, promote enterprise culture, spread voice of NCC and build a bridge of communication for cultural development of enterprise.
Tel:(025)57791561 Fax:025-57794567 Zip:210044 Address:No. 229 Yangxin Road, Luhe District, Nanjing, China E-mail:zjb@njncc.com
Tianchang Phase I project of 100MWp Complementary photovoltaic power generation by fishing light constructed by our company begins to take shape.
Photovoltaic is a New energy technology industry and enjoys tremendous prospect for development. Out company seizes the opportunity and gains a good proportion in the market. Tianchang Phase I project of 100MWp Complementary photovoltaic power generation which is the second Photovoltaic project we construct is running well and taking shape at present. The project,located in the village of Dayu, Yangcun town, Tianchang city, Anhui province, whose main task is to simultaneously build two complementary fishing light projects on the lake, with phase I of 100MW and phase II of 50MW. The total length of the 110KV transmission line is 17 km. The project commenced on September 29th,2016, and completed the 110KV transmission line of 17km on December,2016, realizing partial grid-connected power generation.
Lu Yuming, Vice - Chief Engineer and project manager, as well as all staff, persist starting working at 6:30 every day. They are busy at on-site truck dispersion, material and station distribution and loading and unloading of forty times . Through elaborate arrangement and construction as planned, they combined aquaculture and photovoltaic power generation in a three-dimensional manner with the upper layer used for photovoltaic power generation and the lower layer used for aquaculture.
Fengyutongzhou
英文版底部信息